Books

There are so many books written decades ago with a lot of wisdom we should not forget:
bk41.gif
  Evo Booklets
  Niels Malotaux See the Download page
  Quality
Q1 W.E. Deming Out of the Crisis MIT, 1986 ISBN 0911379010
Q2 Joseph M. Juran Juran's Quality Handbook: The Complete Guide to Performance Excellence 6/e McGraw-Hill, 1951. 4th edition 1988 ISBN 0070331766
Q3 Joseph M. Juran Managerial Breakthrough: The Classic Book on Improving Management Performance McGraw-Hill, 1964. Revised edition 1995 ISBN 0070340374
Q4 Philip B. Crosby Quality Is Free (Signet Shakespeare) McGraw-Hill, 1980. Reissue 1992 ISBN 0451625854
Q5 Philip B. Crosby Quality Is Still Free: Making Quality Certain In Uncertain Times McGraw-Hill, 1996. 4th edition 1988 ISBN 0070145326
Q6 Philip B. Crosby Quality Without Tears: The Art of Hassle-Free Management McGraw-Hill, 1984. Paperback 1995: ISBN 0070145113
Q7 Walter A. Shewhart Economic Control of Quality of Manufactured Product/50th Anniversary Commemorative Issue (1930). Amer Society for Quality, ISBN: 0873890760
Q8 W.A. Shewhart, W.E. Deming Statistical Method from the Viewpoint of Quality Control. Dover Publications, 1986. ISBN 0486652327
Q9 W.G. Latzko, D.M. Saunders Four Days with Dr. Deming: A Strategy for Modern Methods of Management (Engineering Process Improvement Series), Addison-Wesley, 1995. ISBN 0201633663.
Q10 Masaaki Imai Gemba Kaizen: A Commonsense, Low-Cost Approach to Management McGraw-Hill, 1997. ISBN 0070314462.
  Product development / Project Management
D1 Robert G. Cooper Winning at New Products: Accelerating the Process from Idea to Launch Perseus Books, 1993. ISBN 0201563819
D2 Gerard I. Nierenberg Doing It Right the First Time: A Short Guide to Learning From Your Most Memorable Errors, Mistakes, and Blunders John Wiley, 1996. ISBN 047114889X.
Nederlandse uitgave: In ëën Keer Goed, Contact, 1998. ISBN 9025424155
D3 Preston G. Smith en Donals G. Reinertsen Developing Products in Half the Time: New Rules, New Tools, 2nd Edition John Wiley, 1991. 2nd ed. 1997 ISBN 0471292524.
Nederlandse uitgave: Razendsnelle Productontwikkeling. Boekwerk, 1997. ISBN 9054021438
D4 Tom Gilb, et al. Principles Of Software Engineering Management Addison-Wesley, 1988. ISBN: 0201192462.
D5 Niels Malotaux Evolutionary Project Management (Booklet#1). On this website.
D6 Suzanne & James Robertson Mastering the Requirements Process Addison-Wesley, 1999, ISBN: 0201360462.
D7 Ralph R. Young Effective Requirements Practices Addison-Wesley, 2001, ISBN 0201709120.
D8 Tom de Marco The Deadline: A Novel About Project Management Dorset House Publishing, 1997, ISBN 0932633390.
D9 Steve McConnell Software Project Survival Guide (Pro -- Best Practices) How to be sure your first important project isn't your last. Microsoft Press, 1997, ISBN 1572316217.
D10 Kent Beck Extreme Programming Explained: Embrace Change Addison-Wesley, 2000, ISBN 0201616416.
D11 Stanley E. Portny Project Management for Dummies Hungry Minds, 2001, ISBN 076455283X.
D12 Prince2 Reference Manual Managing Successful Projects with PRINCE2 (PRINCE Guidance) Office of Government Commerce, 1996, 2003. ISBN 0113308914.
D13 Tom Gilb Competitive Engineering: A Handbook For Systems Engineering, Requirements Engineering, and Software Engineering Using Planguage Elsevier, 2005. ISBN: 0750665076
D14 Ralph R. Young Project Requirements: A Guide to Best Practices Management Concepts, 2006. ISBN: 1567261698
D15 Ralph R. Young The Requirements Engineering Handbook (Artech House Technology Management and Professional Development Library) Artech House, 2007. ISBN: 1580532667
D16 Paul Solomon, Ralph Young Performance-Based Earned Value (Practitioners). Wiley-IEEE Computer Society, 2006. ISBN: 0471721883
  Management
M1 Willem Mastenbroek Verandermanagement. Holland Business Publications, 1997. ISBN 9074885101
M2 Watts S. Humphrey Managing Technical People : Innovation, Teamwork, and the Software Process (SEI Series in Software Engineering) Innovation, teamwork and the software process. Addison Wesley, 1997. ISBN 0201545977
M3 Eliyahu M. Goldratt The Goal: A Process of Ongoing Improvement A process of ongoing improvement. North River Pr., 2nd ed. 1992, ISBN 0884270610
Nederlandse uitgave: Het Doel. Het Spectrum, 1986-1996. ISBN 9027429383
M4 Philip B. Crosby Running Things Mentor (Penguin), 1989. Paperback 1992: ISBN 0451626893. Hardcover: McGraw-Hill, 1986, ISBN 007014513X.
M5 Ten Haaf, et al Fundamentals of Business Engineering and Management. Delft University Press, 2002. ISBN 9040722102.
The lecture notes from a.o. my father's (Prof. P.CH-A. Malotaux) lectures at Delft University of Technology, translated into English. Order at www.bol.com
M6 Henry Ford My Life and Work - An Autobiography of Henry Ford, 1922. CreateSpace, 2009, ISBN 1442144327
M7 Henry Ford Today and Tomorrow - Special Edition of Ford's 1926 Classic, 1926. Productivity Press, 1988, ISBN 0915299364
M8 Taiichi Ohno Toyota Production System: Beyond Large-Scale Production, Productivity Press, 1988, ISBN 0915299143
M9 Douglas W. Hubbard How to Measure Anything, John Wiley & Sons, 2010, ISBN 9780470539392
  Software process
SP1 B.W. Boehm A spiral model of software development and enhancement, IEEE Computer, 1988
SP2 Watts S. Humphrey Managing the Software Process Addison-Wesley, 1989 ISBN 0201180952
SP3 Watts S. Humphrey A Discipline for Software Engineering Addison-Wesley, 1995 ISBN 0201546108
SP4 Watts S. Humphrey Introduction to the Personal Software Process(sm). Addison-Wesley, 1997 ISBN 0201548097
SP5 Steve McConnell Rapid Development Microsoft Press, 1996. ISBN 1556159005
SP6 Tom Gilb/Dorothy Graham Software Inspection Addison Wesley, 1993. ISBN 0201631814
Note: Niels Malotaux is a trained Inspection Leader for Gilb Inspections.
SP7 Mark C. Paulk, et al. The Capability Maturity Model: Guidelines for Improving the Software Process Guidelines for improving the software process. Addison-Wesley, 1995. ISBN 0201546647
SP8 Michael Dyer The Cleanroom Approach to Quality Software Development John Wiley, 1992. ISBN 0471548235
SP9 Capers Jones Applied Software Measurement: Assuring Productivity and Quality - 2nd ed. McGraw-Hill, 1996, ISBN 0070328269
SP10 Steve Maguire Debugging the Development Process: Practical Strategies for Staying Focused, Hitting Ship Dates, and Building Solid Teams Microsoft Press 1994. ISBN 1556156502
SP11 Richard C. Linger, Carmen J. Trammell Cleanroon Software Engineering Reference Model, Version 1.0. SEI, 1996. CMU/SEI-96-TR-022
SP12 Linger, Paulk, Trammell Cleanroom Software Engineering Implementation of the Capability Maturity Model (CMM) for Software, SEI, 1996. CMU/SEI-96-TR-023. Now in book form: see SP20, below.
SP13 B. v Zeist, P. Hendriks, R. Paulussen, J. Trienekens Kwaliteit van softwareprodukten, Kluwer bedrijfswetenschappen, 1996. ISBN 9026724306. ISO9126 software kwaliteitseigenschappen, uitgebreid in QUINT project met eigenschappen en meetindicatoren. Te bestellen bij SERC.
SP14 SPIRE Project Team, M. Sanders ed. The SPIRE Handbook. Centre for Software Engineering, Ireland. 1998. ISBN 1874303029. Better software development in small organisations.
SP15 Watts S. Humphrey Introduction to the Team Software Process(sm) Addison-Wesley, 1999. ISBN 020147719X
SP16 Kim Caputo CMM Implementation Guide: Choreographing Software Process Improvement Addison-Wesley, 1998. ISBN 0201379384
SP17 Todd Cotton Evolutionary Fusion: A customer-oriented incremental life cycle for fusion, HP Journal, Aug 96. Short guide for evolutionary development project implementation
SP18 Software Engineering Technology, Inc. Cleanroom Engineering Tutorial, DoD STARS tutorial
SP19 Kenneth M. Dymond A Guide to the Cmm: Understanding the Capability Maturity Model for Software, Process Transition International, Inc.,1995. ISBN 0964600803. The pictures in this book make the CMM much more comprehensible.
SP20 S.J.Prowell, C.J.Trammell, R.C.Linger, J.H.Poore Cleanroom Software Engineering: Technology and Process, Addison-Wesley, 1999. ISBN 0201854805.
SP21 Allan M. Stavely Toward Zero Defect Programming, very practical and acceptable explanation of Cleanroom. Addison-Wesley, 1999. ISBN 0201385953.
  Software classics
SC1 Frederick P. Brooks, Jr. The Mythical Man-Month: Essays on Software Engineering, 20th Anniversary Edition Addison-Wesley, 1975 ISBN 0201006502, reprint 1995 ISBN 0201835959
SC2 Frederick P. Brooks, Jr. No silver bullet. IEEE Computer, april 1987
SC3 E.N. Yourdon, editor Classics in Software Engineering Yourdon Press, 1979. ISBN 0917072146
SC4 Tom de Marco Concise notes on software engineering (Yourdon computing series) Yourdon Press, 1979. ISBN 0917072162
SC5 Richard E. Fairley Software Engineering Concepts (Mcgraw-Hill Series in Software Engineering and Technology) McGraw-Hill, 1985. ISBN 0070199027
SC6 Dijkstra manuscript collection Over thousand (!) of Dijkstra's manuscripts can be found on http://www.cs.utexas.edu/users/EWD/
  Software Engineering
SE1 Steve McConnell Code Complete (Microsoft Programming) A practical handbook of software construction, Microsoft Press, 1993, ISBN 1556154844
SE2 Steve Maguire Writing Solid Code: Microsoft's Techniques for Developing Bug-Free C Programs (Microsoft Programming Series) Microsoft Press 1993. ISBN 1556155514
  NASA standards As the links to NASA documents often change, I removed the links I had under these titles.
Google for the title and you probably will find interesting material.
N1 NASA-GB-A302 NASA Formal inspections guidebook (.txt)
N2 NASA-GB-001-94 NASA Software Measurement Guidebook (.pdf)
N3 NASA-GB-001-95 NASA Process Inprovement Guidebook (.pdf)
N4 NASA-GB-001-96 NASA Software Management Guidebook (.doc)
N5 NASA-GB-002-95 Formal Methods Specification and Analysis Guidebook. (MSWord .doc)
Vol I: Planning and Technology Insertion
N6 NASA-GB-001-97 Formal Methods Specification and Analysis Guidebook. (.pdf of .ps)
Vol II: Practitioner's Companion
N7 SMAP-GB-A301 NASA Software Quality Assurance Audits Guidebook (.txt)
N8 NASA CM Gdbk NASA Software Configuration Management Guidebook (.html)